Georgetown Metal Roof Coating Questions
Answers to the metal roof coating questions Georgetown owners ask about rust, screws, laps, coatings, weather, permits, and cost on commercial buildings.

Metal Roof Coating In Georgetown, Answered
Metal roof coating is a liquid-applied membrane sprayed or rolled over steel roof panels to seal fasteners, seams and rust spots while reflecting sunlight. Georgetown Metal Roof Coating coats commercial metal roofs and also offers silicone, acrylic, spray foam and shingle roof coating in Georgetown, Scott County, Kentucky, and in Midway, Cynthiana and Williamstown.
Metal Roof Coating Basics
What does a coating do for a commercial metal roof?
A coating puts one continuous waterproof skin over the panels, screw heads and laps of a metal roof, so water has to get past a single membrane instead of hundreds of small joints. It also shields bare steel from the moisture that feeds rust.
Most systems go on in layers. Cleaning and rust treatment come first, then seam and fastener detailing with a heavy mastic or reinforced tape, then a base coat and topcoat across the whole field.
On a warehouse or shop building, the visible change is a uniform white or light gray roof where faded paint, rust bloom and caulked patches used to show.
Which metal roofs are good candidates for coating?
Metal roofs make good coating candidates when the panels are still firmly attached and the steel shows surface rust rather than holes. Purlins, clips and framing need to be solid before any coating goes on.
Signs that point toward coating:
- Fading or chalking paint across the panels
- Rust bloom around screw heads and along the bottom of panel laps
- Leaks traced to fasteners, end laps or skylight edges
- Panels with intact profiles and few hail dents deep enough to hold water
Signs that point toward bigger work include rust-through you can push a screwdriver into, panels lifting in wind, and wet insulation sagging under the deck.
How does prep differ on standing seam and exposed-fastener R-panel roofs?
Exposed-fastener R-panel roofs take far more detail work before coating, because every screw and every lap is a possible leak. Standing seam roofs hide their clips under raised seams, so prep centers on seam ends, panel terminations and penetrations.
| Prep item | Exposed-fastener R-panel | Standing seam |
|---|---|---|
| Fasteners | Tighten, replace stripped or rusted screws, then seal each head | Concealed clips; check exposed trim screws only |
| Laps | Seal side laps and end laps with mastic or tape | Seal end laps and seam ends at ridge and eave |
| Movement | Thermal movement loosens screws over time | Panels float on clips, so coating must flex at seams |
| Leak hot spots | Screw washers, end laps, skylight panels | Ridge caps, pipe boots, rooftop unit curbs |
Older standing seam roofs with dried-out seam sealant get the same lap treatment as R-panel.
Should I coat, restore, re-panel or replace a metal roof?
The right choice comes down to how much of the steel is still intact. Coating fits roofs with surface rust and leaking fasteners, and replacement fits roofs where the framing or most panels have failed.
| Option | What happens | Best fit |
|---|---|---|
| Coat | Clean, treat rust, seal fasteners and laps, apply coating | Faded or leaking panels with intact steel |
| Restore | Coating plus new screws, spot panel swaps and new trim | Scattered rust-through or damaged skylight panels |
| Re-panel | New panels over existing purlins or a retrofit framing system | Widespread rust-through on solid framing |
| Replace | Tear-off down to the structure | Failed purlins, wet insulation or structural damage |
A close look at the underside around gutters and eaves, where rust starts first, tells the crew which row a roof belongs in.
Rust, Fasteners and Seams
Can you put a coating over a rusty metal roof?
Yes, a coating can go over rusted metal once loose rust is removed and the remaining surface is treated with a rust-inhibiting primer. Coating straight over flaking red rust traps it, and the film peels as the rust keeps growing underneath.
Prep at rust bloom means wire brushing or power-tool cleaning, scraping scale off panel laps, and washing the whole roof.
Light orange staining across a panel is cosmetic and primes well. Heavy red rust along eaves and gutters, where water sits longest, gets the most attention. Panels with holes are cut out and replaced, or patched with new metal, before the coating crew starts.
What is white rust on galvanized roof panels?
White rust is the chalky white or gray buildup left behind as the zinc layer on galvanized steel corrodes. It shows up on newer bare galvanized panels, around fastener heads, and where water lingers at panel laps.
The powder blocks adhesion, so crews scrub it off and rinse the panel before primer or coating goes down. Galvalume panels, which carry an aluminum-zinc layer, have their own primer needs that the coating maker spells out.
An adhesion test patch on a cleaned section shows how the chosen product bonds before the full roof is coated.
Why do screws leak on a metal roof, and how are they fixed?
Screws leak when the rubber washers under their heads dry out, crack, or get crushed from over-tightening. Expansion and contraction of the panels also wallows out screw holes over the years, so the fastener loosens its grip.
Before coating, crews go screw by screw:
- Tighten loose fasteners that still bite
- Replace stripped ones with oversized screws
- Swap any heads that have rusted
- Cover each head with mastic, caps or a brushed detail coat
On a large R-panel roof the fastener count runs into the thousands, which is one reason exposed-fastener roofs take longer to prep than standing seam.
How are panel laps and end laps sealed before coating?
Panel laps and end laps are sealed with a brush-grade mastic, a reinforcing fabric, or a butyl-backed tape, then covered by the field coat. Side laps run up the slope where panels overlap, and end laps cross the slope where one panel run meets the next.
End laps leak more often because water runs straight into them and dirt builds up at the joint. Crews clean the lap, open any rusted seam enough to treat it, then press seam material along its full width.
A lap that flexes underfoot gets extra stitch screws first, so the seal sits on a joint that stays put.
What happens to skylights, ridge caps and gutters during a coating job?
Skylight panels, ridge caps and gutters each get their own detail, because they are where many metal roof leaks begin. Each one is handled before the field coat goes on.
| Component | Problem found | Common fix |
|---|---|---|
| Skylight panels | Brittle, yellowed fiberglass and failed lap sealant | Replace panels or seal laps; keep coating off clear areas |
| Ridge caps | Loose screws, missing closures | Refasten, add foam closures, seal laps |
| Gutters | Rust at seams and outlets, packed debris | Clean, treat rust, coat the interior or replace sections |
| Pipe boots and curbs | Cracked boots, open curb seams | Replace boots, reinforce curb seams with fabric |
Skylight panels are a fall hazard, so crews mark or screen them before anyone walks the roof.
Choosing a Coating
Is silicone or acrylic better over a metal roof?
Where water lingers on the panels, silicone outlasts acrylic, and on pitched metal roofs that drain quickly, acrylic is the usual pick. Urethane coatings fill a third role on areas that see foot traffic or impact.
| Feature | Silicone | Acrylic | Urethane |
|---|---|---|---|
| Standing water | Resists ponding | Softens under ponding | Handles brief ponding |
| Finish | Holds white; picks up dirt | Stays bright and clean | Often paired with a UV-stable topcoat |
| Application weather | Cures in cooler, damp air | Needs dry, warm days | Needs a dry surface and the maker's temperature range |
| Recoating later | Silicone over silicone | Accepts many topcoats | Accepts several topcoats |
| Common use on metal | Low-slope panels, wet spots near gutters | Gabled shop and barn roofs | Walkways and high-traffic areas |
Product data sheets from the chosen maker settle the final pick for a given panel type and slope.
When does acrylic coating make sense on a metal building?
Acrylic coating makes sense on metal roofs with enough pitch to shed water quickly, such as the gabled roofs on shops, barns and pre-engineered warehouses. Water-based acrylics stay bright white and clean up with water, which keeps maintenance simple.
Acrylic needs a stretch of dry weather to cure, and rain on a fresh coat washes it off. On a Kentucky job that means watching the forecast closely in spring and fall.
Acrylic is a weak choice where water collects, like flat spots at gutters, behind rooftop units, or in hail-dented panels that hold puddles after a storm.
Can silicone coating handle ponding water on a low-slope metal roof?
Silicone is the coating most often chosen for low-slope metal roofs where some water sits after rain, because it resists breaking down under standing water. Older low-pitch roofs with sagging purlins often show puddles near gutters and at end laps.
Silicone comes with trade-offs:
- Dirt sticks to the surface and dulls its reflectivity over time
- Recoats later need silicone, since most other coatings bond poorly to it
- Wet silicone is slick, so walkway pads around units help
Ponding that lasts for days points to a drainage or framing problem, such as a bent purlin or a clogged gutter outlet, and that gets fixed before any coating.
Should spray foam go over a metal roof instead of a coating alone?
Spray foam over metal adds insulation and fills the panel corrugations, while a coating alone seals and reflects without adding much R-value. Foam suits metal buildings that run hot or cold inside; coating alone suits buildings where the panels just leak.
| Factor | Coating only | Spray foam plus coating |
|---|---|---|
| Insulation | Little to none | Closed-cell foam at about R-6 per inch, per DOE Building America |
| Thickness | Thin film | Inches of foam that raise edges and trim |
| Fasteners and laps | Sealed one by one | Buried under continuous foam |
| Drainage | Follows existing panel slope | Foam can be tapered to fill low spots |
| Prep | Clean, prime, seal | Clean, prime, then foam and coat |
Raised roof edges mean gutters, ridge caps and eave trim may need adjusting after foam.
Can you coat an asphalt shingle roof on a commercial building?
Asphalt shingle roofs on commercial buildings such as strip centers, offices and churches can be coated when the shingles lie flat, hold their granules, and the shingle or coating maker approves the product. Shingle coatings are thin, flexible products made for granulated surfaces.
Limits come from the shingles themselves:
- Curled, cupped or missing tabs show a roof near the end of its life
- Granule loss down to the mat leaves little for coating to grip
- Manufacturer terms on the existing shingles can be affected by coating
A shingle coating extends a roof in good shape and is a poor fix for one already leaking through the deck. These buildings often have metal canopies or low-slope sections that get coated at the same time.
What does a white reflective coating do for a hot metal building?
A white reflective coating lowers roof surface temperature on sunny days by bouncing back more sunlight than faded or rusted steel. Bare and painted panels heat up fast and pass that heat into shops and the upper air of warehouses.
The Cool Roof Rating Council directory lists measured solar reflectance and thermal emittance for rated coatings, so owners can compare products on the same terms. Reflectance drops as a coating collects dirt, which is why the council reports aged values too.
Kentucky has real winters, so the payoff is largest on buildings cooled all summer or housing heat-sensitive work.
Climate and Weather Around Georgetown
How much rain does a coated metal roof face around Georgetown?
Roofs around Georgetown shed close to 50 inches of precipitation in a normal year, based on National Weather Service normals for nearby Lexington. NWS Louisville logged 49.98 inches at Lexington in 2024, right near that normal, and normal snowfall there runs about 14.5 inches.
All that water tests the low points first:
- Gutters packed with leaves overflow back under eave trim
- End laps near the eave collect runoff from the whole panel run above
- Valleys between building wings carry the heaviest flow
Clean gutters and well-sealed end laps matter as much on a Scott County roof as the coating chosen.
Does hail damage a coated metal roof?
Hail dents metal panels, and a large stone can crack a coating at the dent or split it along a seam. NWS Louisville reported hail across the Lexington metro in March 2024 and golf-ball-size hail in several Kentucky counties that May.
After a storm, check for:
- Dents that now hold water on low-slope panels
- Cracked or crazed coating at ridge caps and panel ribs
- Broken skylight panels and dented gutters
- Coating flakes washed into downspouts
Photograph the damage before repairs. Small coating cracks are patched with the same product, and dented panels that hold puddles call for a ponding-resistant coating or new panels in that spot.
How do Kentucky temperature swings affect seams and fasteners?
Big temperature swings make metal panels grow and shrink, which works fasteners loose and opens laps over time. NWS Louisville recorded minus 7 degrees at Lexington on January 21, 2024, followed by a high of 64 four days later.
A long panel run moves more than a short one, so long warehouse roofs feel this most at end laps and ridge caps. Water that sneaks into a lap and freezes pushes the joint further open.
Coatings made for metal are elastomeric, so they stretch with the panels. Reinforcing fabric at laps and a detail coat over each fastener give those joints extra flexibility.
When is the best time of year to coat a metal roof in central Kentucky?
Late spring through early fall gives the most reliable coating weather in central Kentucky, with warm days, long daylight and drier stretches between storms. Coatings need panel and air temperatures within the maker's range, and dew-free panels.
Morning dew sits on metal panels well after sunrise, so crews start coating once the surface dries. Late-day showers matter most for acrylic, which needs dry hours to set. Silicone handles cooler weather better and stretches the season into fall.
Summer panels get very hot by mid-afternoon and can climb past a product's limit, so July and August work shifts toward the morning.
Prep, Application and Downtime
How is a metal roof cleaned before coating?
A metal roof is cleaned with a pressure washer and a cleaner matched to the coating system, which strips dirt, chalking paint, oil and loose rust. Spots around exhaust fans and kitchen vents get a degreaser.
Steps in order:
- Clear debris from gutters, valleys and around curbs
- Wire-brush or grind rust bloom and scale
- Wash the whole roof and rinse off cleaner residue
- Let panels dry fully
Rinse water carrying old paint chips is caught at gutters and downspouts instead of running onto landscaping or parking areas. A clean, dry panel is where every coating maker's instructions begin.
Does a metal roof need primer before coating?
Most metal roofs get primer, either a rust-inhibiting primer over treated rust or a bonding primer over galvanized or Galvalume panels. The coating maker names which primer pairs with its product for each panel type.
Primer goes on after cleaning and before seam work, often only where it is needed: rusted laps, fastener rows, gutter interiors and bare spots. Some silicone systems skip primer on clean, factory-painted panels that pass an adhesion test.
A test patch, coated and then pulled after it cures, shows the bond strength before the full field goes on.
Can my building stay open while the roof is coated?
Nearly every commercial building stays open while its metal roof is coated, since the work happens on top of the panels. Noise from pressure washers and grinders is the main disruption, along with crew access and material staging.
Plan around a few items:
- Air intakes on rooftop units, which may need to shut down during spraying
- Parking spaces under the work area, kept clear of overspray
- Ladder or lift access placed away from customer entrances
- Loading docks, which keep running while crews work other sections
Large roofs are coated section by section so production areas keep working. Dry weather and roof size set the schedule more than anything else.
How are rooftop units, curbs and penetrations handled?
Rooftop units, curbs and pipe penetrations are detailed with reinforced coating or new flashing before the field coat, because they are common leak points on metal roofs. Each curb seam gets fabric and a heavier coat where it meets the panel ribs.
Units are shut off at their disconnects when coating near the intakes, and the HVAC service company can check them before restart. Old pitch pans are cleaned and refilled, and cracked pipe boots are replaced.
Coating stops short of unit service panels, nameplates and condensate drains so service work stays easy later.
How thick is a metal roof coating, and how is it checked?
Coating thickness is set by the product data sheet and the system chosen, measured in mils of dry film. Crews check it during application with a wet film gauge and confirm cured thickness with small test cuts.
Seams, laps and fasteners get more material than the open field, because movement and water concentrate there. Ribs on R-panel roofs tend to come out thinner than the flats, so spray passes are adjusted to cover both.
Owners can ask to see gauge readings and the gallons used compared with the roof area, which together show the coating went on at the specified thickness.
Cost, Value and Taxes
What drives the cost of coating a commercial metal roof?
Roof size, rust level and fastener count drive most of the cost of a metal roof coating job. A clean, square warehouse roof costs less per square foot than a small roof crowded with penetrations.
| Cost driver | Why it matters |
|---|---|
| Rust and panel damage | More grinding, priming and panel replacement |
| Exposed fasteners | Labor to tighten, replace and seal each one |
| Coating type and thickness | Silicone, acrylic and foam differ in material and labor |
| Access | Roof height, lifts and traffic on the ground |
| Penetrations and skylights | Detail work at every curb, pipe and skylight panel |
| Gutters and trim | Rust repair or replacement adds scope |
Spray foam adds material and labor along with its insulation value.
Is coating a metal roof worth it compared with replacing it?
Coating pays off when the panels and framing still have plenty of life, because it stops leaks and slows rust with far less material and disruption than new panels. Tear-off also hauls old steel and insulation away, while coating keeps the existing roof in service.
Value grows when a roof:
- Leaks mainly at screws, laps and skylight panels
- Covers an operating plant, store or warehouse that has to stay open
- Has dry insulation under the deck
Replacement is the better spend when rust-through is widespread or panels move under foot traffic. A walk-through and an underside check settle which side a roof falls on.
Does Section 179 cover a metal roof coating?
Roofs on existing nonresidential buildings can qualify for the Section 179 deduction, according to IRS Publication 946, which lists roofs among improvements made after the building was first placed in service. Residential rental property is excluded.
For tax years beginning in 2026, the maximum deduction is $2,560,000, with the phase-out starting at $4,090,000 of qualifying property.
Treating a coating as a roof improvement or as a repair expense is a call for a CPA who knows the building's tax history. Keep invoices that separate cleaning, fastener work, primer and coating.
Permits, Codes and Utilities
Do I need a permit to coat a commercial metal roof around Georgetown?
Permit needs for roof coating vary by office, so call the office covering the property before work starts. Panel replacement, foam over metal and re-roofing are more likely to need a permit than a coating-only job, and each town here answers to a different office.
| Town | County | Building permit contact |
|---|---|---|
| Georgetown | Scott | Georgetown Building Inspection (city office) |
| Midway | Woodford | Woodford County local building inspector (state-listed) |
| Cynthiana | Harrison | Harrison County local building inspector (state-listed) |
| Williamstown | Grant | Grant County local building inspector (state-listed) |
Have the roof area, panel type and coating system ready for the call.
Which building code covers commercial roof coating in Kentucky?
The Kentucky Building Code, published by the Kentucky Department of Housing, Buildings and Construction, covers commercial roofs statewide, including coating and recover work over metal. Local inspectors enforce it alongside the state.
On a metal roof, the code points that come up most:
- Fire classification of the coating or foam assembly over the panels
- Recover rules for adding layers over an existing roof
- Wind resistance of edge metal, ridge caps and trim
- Insulation requirements when foam is added
Coating makers publish fire ratings and code listings for each system. Match those listings to the roof slope and deck type before calling the permit office.
Which electric utilities serve commercial buildings in these towns?
Kentucky Utilities, Blue Grass Energy and Owen Electric serve commercial buildings around Georgetown, and the meter location decides which one. Each lists Scott County in its territory.
| Town | Utility listed for the county |
|---|---|
| Georgetown (Scott) | Kentucky Utilities, Blue Grass Energy, Owen Electric |
| Midway (Woodford) | Blue Grass Energy |
| Cynthiana (Harrison) | Blue Grass Energy |
| Williamstown (Grant) | Owen Electric |
Other providers serve parts of these counties, so check the name on the bill. Ask that utility about business energy programs, since offerings change and none come with a roof job. A cooler roof surface trims summer heat gain, so the topic fits alongside coating plans.
Questions by Town
How do coatings fit the large industrial metal buildings in Georgetown?
Georgetown's industrial base includes Toyota Motor Manufacturing Kentucky, which Toyota describes as about nine million square feet of plant on 1,300 acres, along with warehouses and plants of many sizes around the city. Big metal roofs here run long panel lengths dotted with exhaust fans and curbs.
Long panel runs move a lot with heat, so end laps and fasteners at ridge caps get reinforced first. Work goes section by section to keep production areas covered, with roof access planned around shift changes and dock traffic.
Silicone fits low-slope metal sections that hold water near gutters, and foam fits buildings that want insulation added over the deck.
Who reviews commercial roof work inside Georgetown city limits?
Georgetown Building Inspection, a city office, handles commercial plan review and inspection inside Georgetown and also enforces the joint Georgetown and Scott County zoning ordinance. Commercial renovations and repairs fall under its review.
For a metal roof, have these ready before calling:
- Roof area and panel type, R-panel or standing seam
- Planned coating system, or foam thickness if foam is added
- Any panel, gutter or skylight replacements
- Changes to edge height from added foam
Owners of buildings outside city limits in Scott County should ask the same office which reviewer applies, since its page describes city permits and joint zoning.
Who handles permits for a commercial roof in Midway?
Midway sits in Woodford County, so a building a short drive from Georgetown answers to a different permit office. The Kentucky Department of Housing, Buildings and Construction lists a Woodford County local building inspector and also assigns a state building inspector to the county.
Call the Woodford County inspector with the property address, roof area and coating plan. Panel replacement, new skylight panels, or foam that raises the roof edge are the items most likely to need a permit.
Blue Grass Energy lists Woodford County in its service area, a useful contact for business energy questions tied to a cooler roof over a Midway shop or office.
What should owners of metal farm buildings near Midway check before coating?
Barns and equipment sheds on rural Woodford County farms around Midway need ventilation, livestock safety and long-span roof details checked before coating. Many have long gabled roofs with open eaves, ridge vents and translucent panels for daylight.
Points to check:
- Ridge vents that must stay open, so coating stops short of the vent slots
- Translucent roof panels, kept clear of coating
- Animals and feed, moved away from the drip line during washing and spraying
- Gutter outlets that drain into paddocks or lots
Acrylic suits these steeper gabled roofs that shed water quickly, and water-based products keep odor down around animals.
Who inspects commercial roofing work in Cynthiana?
Harrison County's local building inspector, listed by the Kentucky Department of Housing, Buildings and Construction with a county planning office contact, is the first call for commercial roof work in Cynthiana. A state building inspector is also assigned to the county.
Electrical work, such as reconnecting rooftop unit wiring after curb repairs, goes through the county judge executive's office or the city office where the work happens.
Ask the Harrison County office how it treats coating-only work versus panel replacement, and give it the roof area, panel type and coating system. Blue Grass Energy lists Harrison County in its service area.
What should Cynthiana owners near the Licking River plan for?
Commercial buildings near the South Fork of the Licking River in Cynthiana should confirm flood plain status with the county before larger roof projects, and keep roof water moving well away from their foundations. Low ground near a river holds damp air, which speeds rust on bare steel.
Roof items that matter most here:
- Gutters and downspouts sized for heavy storms, with outlets kept clear
- Rust at the lowest panel courses and eave trim, where moisture lingers
- Wall panels and trim near grade, checked for rust before the roof is coated
A rust-inhibiting primer at eaves and gutters is time well spent on these buildings.
Who issues building permits for a commercial roof in Williamstown?
Williamstown commercial roof permits start with the Grant County local building inspector, whom the Kentucky Department of Housing, Buildings and Construction lists with an office in the old Grant County courthouse in Williamstown. The state also assigns its own building inspector to Grant County.
For electrical work tied to the roof, the state contact sheet points to the county judge executive's office or the city office where the work is done.
Give the office the roof area, panel type, coating system and any skylight panel or gutter replacement. Grant County sits outside Scott County, so a permit from Georgetown carries no weight there.
What utility and weather details matter for a Williamstown metal building?
Owen Electric, a cooperative that lists Grant County in its service area, powers many commercial and farm buildings around Williamstown. Check the bill, since the meter location decides the provider.
Storm warnings for Grant County come from the National Weather Service office in Wilmington, Ohio, while central Kentucky, including Lexington, falls to NWS Louisville. Crews planning coating days in Williamstown watch Wilmington's forecasts for rain and wind.
Williamstown sits on Interstate 75 in northern Kentucky, so a metal building there sees the same freeze-thaw and storm wear as roofs farther south. Check fasteners, end laps and gutters after each hard winter.
Getting Started
What should I gather before a metal roof walk-through?
Leak history, roof access details and records of past repairs are the most useful things to gather before a metal roof walk-through. Dated photos of interior stains help match leaks to fasteners, laps or skylight panels above.
Useful items:
- Building age and panel type, if known
- Locations of past leaks and any buckets or tarps inside
- Roof access points, hatch keys and ladder locations
- Service company contact for rooftop units
- Prior coating or repair invoices
Note any sagging or stained insulation seen from inside the building. The walk-through covers rust, fasteners, laps, gutters and skylight panels.
How often should a coated metal roof be inspected?
A coated metal roof should be inspected at least once a year and after any major hail or wind storm. Fall checks catch leaf-packed gutters before winter, and spring checks find freeze-thaw damage at laps.
Look for:
- Coating worn thin at ribs and walkways
- Cracks at ridge caps and around curbs
- Rust spots returning at fasteners
- Dirt buildup that dulls a white finish
Small spots get cleaned and recoated with the same product. A log of photos from each check shows how the roof changes from year to year.
Sources
Sources
- Building Inspection, City of Georgetown
- Woodford County inspector contacts, Kentucky Department of Housing, Buildings and Construction
- Harrison County inspector contacts, Kentucky Department of Housing, Buildings and Construction
- Grant County inspector contacts, Kentucky Department of Housing, Buildings and Construction
- 2018 Kentucky Building Code, Kentucky Department of Housing, Buildings and Construction
- Publication 946, How To Depreciate Property, IRS
- 2024 Annual Climate Summary, National Weather Service Louisville
- National Weather Service, Wilmington, OH office
- Which Spray Foam Is Right for You?, U.S. Department of Energy Building America
- Rated Products Directory, Cool Roof Rating Council
- Kentucky Utilities Company Electric Tariff, Kentucky Public Service Commission
- Owner-Member Cooperatives, East Kentucky Power Cooperative
- Toyota Motor Manufacturing Kentucky, Toyota Pressroom
Question About Your Own Roof?
Call and describe the panels, the leaks, and the rust you see. We will answer what we can by phone and set up a roof walk for the rest.
Get A Free Estimate For Your Metal Roof
Tell us about the building and the roof, and we will follow up with a roof walk and a plain answer.